LOCKER ROOM FLOORING PROJECT

We were invited to install new flooring in the locker area of the San Luis Obispo Mission College Preparatory Catholic High School. The contractor did a wonderful job putting together a new space.

We installed Armstrong VCT tile with a 20% accent color, carpet tiles in the office and rubber flooring and treads in the hall and stairs down to the gym.

We are awaiting the lockers to put the final touches of base boards on the walls.

Leave a Reply